Print

Underway

Railway's Surveys Underway

 

(as received from Ministry of Railways in January, 2012)

 

Railway's Surveys Underway
Sl. No. Project Remarks Kms Cost (Rs.Cr.)
Assam
1. New Line from Silighat to Tezpur along with construction of bridge river across River Brahmaputra Survey in progress sanctioned in 2011-12 33  
2. New Line from Salona to Khumtai Survey completed, Report under examination. 99 2932
3. New Line from Jorhat to Sibsagar. This part of Chaparmukh-Dibrugarh. To be done under PMRVY Survey completed,  2010-11 and examined. 344 3491
4. 2nd Railway Bridge at Saraighat across River Brahmaputra Survey completed, Report under examination.   300.67
5. New Line from Tirap – Lekhapani Survey completed, Report under examination 6 52
6. New Line from Pancharatna to Silchar Shelved by Board   437 18180.5
7. Doubling of New Bongaigaon to Kamakhya via Goalpara Survey in progress   178  
8. Doubling of New Bongaigaon to Kamakhya via Rangiya Survey in progress   150  
9. Doubling of Digaru to Dibrugarh Survey completed   520 3189
10. Railway Electrification from Guwahati to Dibrugarh RE from Katihar to Guwahati is sanctioned and work is in progress.          
Arunachal Pradesh
1. New Line from Lekhapani to Kharsang Survey completed. Report under examination 31 318 
2. New Line from North Lakhimpur to Shilapathar via Along Survey completed and Report under examination. 248 11155 
3. New Line from Jagun to Nampong via Jairampur. Survey not yet sanctioned.    
4. New Line from Miao via Jagun and Kharsang. Survey not yet sanctioned.    
5. New Line from Pasighat-Tezu-Parsuramkund. Survey in progress 130   
6. New line from Rowta to Twang via Udalgiri-Shikardanga-Kalaktang-Shergaon-Tenga. Not yet sanctioned.     
7. New Line from Misamari-Tawang Survey in progress 329  
Manipur
1. New Line between Imphal-Moreh (Myanmar)  Survey to be sanctioned.     
Nagaland
1. New Line from Dimapur to Tizit Survey is in progress  190   
2. New Line from Amguri to Naginimora Survey completed and report under examination 31 389
3. New Line from Tuli-Tuli Town Shelved 9  109
Mizoram
1. New Line from Sairang to Indo-Mayanmar Multi Modal Transit Transport Route at Hruitezwl and lateral extension to Tlabung and Chaphai. Deferred    
2. Lalabazar (Assam)-to Vairengte (Mizoram) - 20.3 364.10
Tripura
1. New Line from Agartala-Akhaura BG rail line as a National Project. (Total length on Indian side 5.4 Kms & cost Rs. 105.55 Cr.) Survey in progress 10 251.19 
2. New Line from Belonia (Tripura) to Belonia (Bangladesh) and Sabroom- Ramgarh. Survey not yet sanctioned.    
Meghalaya
1. New Line from Jogighopa (Panchratna)-Tikrikila-Selsella-Zikzak-Baghmara-Ranikor-Shella-Dawki-Silchar. Shelved by Board 437 18180.57 
2. New Line from Jowai-Lokro Survey in progress 170  
3. New Line from Shillong to Chandranathpur Survey sanctioned in 2011-12    
Sikkim
1. Extension of New Line from Sivok -Rangpo (sanctioned) & Rangpo to Bhusuk (Gangtok) Sivok – Rangpo sanctioned & being done by IRCON. 69 4853.36
2. New Line from Mirik-Rangpo- Mirik-Gangtok:-Survey already done,Rly asked to explore possibility of connecting this line to Sivok-Rangpo-Gangtok line at some points to save on  cost. 163 11684.29

 

Page Maintained By: 
Infrastructure, Director